Wacker Chemie AG: a continuous optimisation of the energy supply
06 Apr 2016

Annex Wacker Chemie AG

Wacker Chemie and E.ON entered into a long-term agreement for the on-site production and supply of heat and power for use in Burghausen plant. The huge power and steam demand at Wacker’s site was originally covered by on-site generation in a steam power plant. To streamline the energy supply, the existing steam power plant was extended and E.ON implemented several technical optimisation measures for the CHP plant.

Wacker Chemie AG is a globally operating chemical company in the fields of semiconductors, polysilicon, polymers, silicones and specialties chemicals. The site in Burghausen, Bavaria, is Wacker’s principal production site with a huge power and steam demand. The main part of the energy demand is covered by the CHP plant.

In 2003 E.ON acquired the CHP plant with a capacity of 119 MW and took over the management of the plant. E.ON and Wacker Chemie entered into a long term partnership, extended till 2019. Besides contractual re-design, several technical optimisation measures were implemented: the gas turbine maintenance was integrated into the E.ON organisation including the spare parts pool of the E.ON group.

Main Plant Components

Gas Turbine:

  • General Electric 9E
  • 119MW-el

Heat Recovery boiler:

  • Foster Wheeler
  • Natural Circulation Boiler
  • Double Pressure System

Heat Accumulator:

  • 3xBalcke-Durr

E.ON Connecting Energies Italia Srl
Piazza Sigmund Freud 1 - Torre 2
20154 Milano

Tel. +39 02 89448001
Email: This email address is being protected from spambots. You need JavaScript enabled to view it.
Website: www.eon-connecting-energies.com

Direct contact:

Pasquale Cardamone
Head of Development Industrial CHP Solutions
Tel.: +49 170 792 1202
Email: This email address is being protected from spambots. You need JavaScript enabled to view it.

 

( Be first to rate this item! ) 

rc-logo  eu-logo  cefic-logo 

Powered by

extramile